Defense Generator and Rail Center Design
The high-bay facility was converted from a towed artillery repair shop to the main building supporting the DGRC mission. This included two new train rails extending the length of the building, a new maintenance drop pit, new overhead doors, and new bridge crane. A new industrial waste line was routed to the existing campus system. Our team provided the design of a new blast booth, new paint booth, and new wash rack inside two adjacent, stand-alone buildings connected with rail access.